Features
Installation Area Large-Scale Excavation
For housing complexes, single tank systems can cater for up to 248 people. Large-scale installation area excavation is possible, meaning establishment costs can be reduced.
Stable Treatment Performance
Aeration processing is carried out following the separation of liquids and solids within wastewater, providing stable treatment performance. The system is compatible with a wide range of inflow water qualities, and can therefore be used for an array of building types.
Specifications
Specifications for Housing Complex Use
Inflow BOD concentration: 200mg/ℓ 200ℓ/person/day
Drainage time: 12hrs For inflow pipe base less than GL-950mm
Number of Users for Design | 51 | 60 | 70 | 80 | 90 | 100 | 120 | 140 | 160 | 180 | 200 | 300 | 400 | 500 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Average daily wastewater inflow (㎥/day) | 10.2 | 12.0 | 14.0 | 16.0 | 18.0 | 20.0 | 24.0 | 28.0 | 32.0 | 36.0 | 40.0 | 60.0 | 80.0 | 100.0 |
Tank length (㎜) | 3,750 | 3,820 | 4,080 | 4,480 | 4,890 | 5,310 | 6,160 | 6,980 | 7,820 | 8,560 | 9,490 | 8,370 5,570 | 11,070 7,080 | 8,360 6,490 7,830 |
Total electrical capacity (kW) | 1.80 | 2.50 | 4.00 | 4.05 | 4.20 | 5.75 | 9.10 |
Specifications for General Restaurant Use
Inflow BOD concentration: 220mg/ℓ 181ℓ/person/day
Drainage time: 8hrs For inflow pipe base less than GL-950mm
Number of Users for Design | 51 | 60 | 70 | 80 | 90 | 100 | 120 | 140 | 160 | 180 | 200 | 300 | 400 | 500 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Average daily wastewater inflow (㎥/day) | 9.24 | 10.86 | 12.67 | 14.48 | 16.29 | 18.10 | 21.72 | 25.34 | 28.96 | 32.58 | 36.20 | 54.30 | 72.40 | 90.50 |
Tank length (㎜) | 4,040 | 4,330 | 4,870 | 5,400 | 5,940 | 6,470 | 7,530 | 8,600 | 9,660 | 10,730 | 5,500 6,550 | 8,190 9,290 | 8,010 8,010 7,050 | 9,920 9,920 8,560 |
Total electrical capacity (kW) | 1.80 | 2.50 | 2.55 | 2.60 | 4.20 | 4.35 | 6.10 | 9.85 |